WhatsApp Get Quote

02 / Engineering and Delivery

One accountable journey from design to aftercare.

Every phase has a clear technical purpose, documented output and responsible Walnut lead.

One Technical OwnerFewer handoffs. Clearer decisions. Better project control.

The Walnut Method

Tell the service story as one accountable journey.

Smart home installation succeeds when decisions are coordinated before walls, ceilings and finishes are complete. Walnut connects early requirements to final commissioning through one structured lifecycle.

01

Consult

Understand the property, lifestyle, stakeholders, objectives and available drawings.

Primary deliverableClient requirements brief
02

Survey

Review site conditions, electrical points, network requirements and integration constraints.

Primary deliverableSite survey and prerequisites
03

Design

Coordinate automation, controls, network, lighting, security and user journeys.

Primary deliverableSystem design and marked layouts
04

Supply

Confirm approved devices, quantities, compatibility and delivery sequence.

Primary deliverableApproved BOQ and delivery plan
05

Install

Execute professional installation with coordinated testing at each stage.

Primary deliverableInstallation records
06

Commission

Configure, test and calibrate every agreed system and scene.

Primary deliverableCommissioning checklist
07

Train

Guide homeowners, family members and estate staff through practical use.

Primary deliverableTraining and handover
08

Support

Protect performance through remote assistance and scheduled service.

Primary deliverableAftercare pathway

Project Prerequisites

Coordinate the infrastructure early.

01

Approved Drawings

Final high current and low current layouts allow the automation plan to be completed accurately.

02

Neutral at Switches

A neutral conductor is required at every smart switch point.

03

Switch Box Depth

Provide a minimum 5 cm switch box depth for appropriate device installation.

04

Dimming Coordination

Dimmable lighting must use compatible drivers, including 0 to 10V where specified.

Early coordination

Send your drawings for an engineering review.

We can assess the current project stage and identify the right next technical step.

Submit Project Brief